Category: Repairs

  • 26.03.02 – Meeting Packet

    Ratify Prior Meeting Minutes – Board Vote We need to ratify our prior meeting minutes found here. Basement Rebuild Progress The basement is currently undergoing reconstruction to allow all residents to access their storage units. As soon as we have a date for re-opening it will be communicated to all residents. Ziply Fiber – Release…

  • 26.02.02 – Meeting Packet

    Ratify Prior 2x Meeting Minutes – VOTE We need to ratify our prior meeting minutes found here and here. Budget Ratification – VOTE As per Washington law, we must ratify the budget adopted by the Board. The budget is ratified automatically unless a majority of the total voting power in the association (not just those…

  • 25.05.05 – Meeting Packet

    Apologies for the delayed packet! Was out of town when I would normally write these and have been playing catch-up ever since! Ratify Prior Meeting Minutes – VOTE We need to ratify our Minutes from the April board meeting Intrusive Inspection – 5th / 6th As part of our ongoing insurance claim, we have an…

  • 25.04.04 – 19728 Roof Delayed?

    Our intention is still to start roofing 19728 on Monday, however we are at the mercy of the weather, and suspect the residents of 19728 wouldn’t appreciate rain in their dwellings. Based on the current forecast, KSR Roofing anticipates that Monday wont be a good start date. As we have more details, they will be…

  • 25.04.07 – 19728 Roof

    On Monday, April 7th, KSR roofing will begin replacing the roof of 19728, barring major weather events which may bump the schedule. This work is estimated to take 2 weeks at the maximum. As we get closer to the event, we will send further communications, and may need to reserve several parking spots to support…

  • 25.02.03 – Meeting Packet / Tree Removal / 19728 Roof

    Meeting Packet See y’all at the meeting, Monday, February 3rd @ 6pm. meeting codes are on your doors / in your inbox. Feb 20th Tree Removal The 2 trees adjacent to 19732 are to be removed Feb 20th, please exercise caution around the job site and follow instructions from workers for your safety. 19728 Roof…

  • 24.12.02 – Meeting Packet

    See Y’all at the meeting! Monday the 2nd, 6pm. Meeting codes have already been emailed separately and will be subtly taped to your door several times. This is the one to attend as we set our budget for 2025. NOTE: The above budget XLSX file is the framework we will be discussing, with formulas to…

  • 24.11.21 – Drains, Fence, Litigation, Budget

    Drains – $2690 We have had trouble in the past scoping plumbing quotes. In short, we need to pay to even get accurate quotes to start fixing problems, as intrusive investigations are often required to get the full scope of what is happening underground. We are acting on a quote (see below) from a preferred…

  • 24.10.02 – 19730 Roof Complete

    Thanks to everyone for their patience during construction. Please bring any feedback on what we can do better next time to our upcoming meeting on Monday October 7th @6pm. Note that the drone shots were prior to the gutters being installed.

  • 24.10.07 – Meeting Packet

    Roof Pictures Note these pictures span several days, at this point all but the gutters have been replaced, and we anticipate that being wrapped today or tomorrow. Basement Pictures All sheeting and misc debris cleaned and removed, all winter gear stored away, ready for reconstruction.